Centre for Scholarship and Innovation
Presentation by Silvia Bergamini and Calum MacCormick for the 13th eSTEeM Annual Conference which took place on the 10-11 April 2024.
| Attachment | Size |
|---|---|
| 2024-04-Day-1-Teaching-Innovation-Talks-Silvia-Bergamini-Calum-MacCormick.pptx (68.42 MB) | 68.42 MB |